Inox Patel Nagar, Delhi

Project: Four Screen Multiplex at Patel Nagar Delhi
Our scope of works: Energy Audit, Analysis and Measures

Major outcome of the audit

  • Projected overall savings: Rs. 25.25 Lakhs
  • Immediate savings – with minimal investments: 9 + Lakhs
  • Chillers were found operating at very high iKW/ TR, i.e 2.1+ compare to 1.1 as it should be ideally.
  • Chilled water pumps were operating inefficiently and not in sync with the chillers.
  • Online UPS for the projection and audio system were found operating at less than 50% capacity hence suggested to reduce capacities in the future outlets to save capital cost.
  • As per the harmonics analysis, system was found operating in the permissible limits.
  • Prepared a 90 page report with all the analysis along with graphs and tables. Suggested a detailed implementation plan to optimize energy consumption.